Is the due date realistic?
Looks usable10 days remain based on the listed due date. Still confirm timezone and submission method.
Decision Header
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE MATERIEL COMMAND.AF INSTALLATION & MISSION SUPPORT CENTER.FA8903 772 ESS PK | DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE MATERIEL COMMAND.AF INSTALLATION & MISSION SUPPORT CENTER.FA8903 772 ESS PK
Due date
2026-08-28
NAICS
Not listed
PSC
Not listed
Set-Aside
No Set aside used
Opportunity Type
Special Notice
Contract Type
Construction
The exact requirement is not clear from confirmed source text and needs review. Possible clues are shown below and should be reviewed before relying on them.
Documents found, processing pending. Some details may improve after download and text extraction finish.
SAM.gov description
View original on SAM.govDescription source: SAM description
This Area of Interest (AOI) is published under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice. All submissions must adhere to the procedures and guidelines outlined in the parent MACH1 framework document unless otherwise tailored herein. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the statutory authority of 10 U.S.C. § 2808a. The 772nd Enterprise Sourcing Squadron (772 ESS), in coordination with the Air Force Civil Engineer Cetner (AFCEC), is seeking an innovative commercial partner to execute this project in two distinct Lines of Effort (LOE); Design & Planning (LOE 1), Physical Construction (LOE 2) for the scope defined as follows. The Government intends to upgrade both the Joint Base San Antonio (JBSA) - Lackland West facilities and the Chapman Training Annex, beginning with the Chapman Annex. The total 341st Training Squadron requirement is to house and train 850 dogs across two sites to support the Defense Military Working Dog (MWD) Kennel Program. This AOI seeks an innovative partner to rapidly develop a comprehensive, site-specific, and constructible design package using non-traditional construction approach built on Engineered Tensile Facilities (ETF) as the baseline structure. This initial Line of Effort (LOE 1) Design & Planning: will focus exclusively on delivering a mature design and a firm, executable plan for the full construction effort.The primary goal of LOE 1 is to produce a detailed, site-specific plan that enables a rapid and predictable approach for LOE 2: Physical Construction. See attachment PDF: MACH1_AOI_FA890326OT002_MWDK_10 Aug 26
Confirmed facts are separated from possible or missing facts so the page stays useful without pretending every detail is known.
Project scope
ConfirmedMACH1_AOI_Military Working Dog Kennels at JBSA-LOE1
Quantity
Not foundNot found in processed sources.
Quantity may not apply to this contract type.
PN / NSN / model
Not foundNot found in processed sources.
Product identifiers may not apply to this contract type.
Site / location
Needs reviewNot found in processed sources.
Agency office addresses and clause fragments are not treated as confirmed delivery locations.
Period of performance
Needs reviewNot found in processed sources.
Submission deadlines are kept separate from delivery or performance timing.
Submission method
Needs reviewNot clearly extracted yet. Confirm the official submission method before responding.
Required forms
Not foundNot found in processed sources.
Pricing / CLIN structure
Not foundNot found in processed sources.
Wage / compliance signals
Not foundNo specific wage, labor, cyber, or CMMC signal detected from processed sources.
Restrictions
Not foundNo specific restriction language detected from processed sources.
Use this checklist to decide whether this opportunity is worth deeper review. GovWerk organizes signals; you make the decision.
10 days remain based on the listed due date. Still confirm timezone and submission method.
MACH1_AOI_Military Working Dog Kennels at JBSA-LOE1
NAICS and PSC are not listed. Use the Codes page and official source to confirm fit.
Set-aside listed: No Set aside used. Confirm your business actually qualifies before bidding.
1 attachment(s) had readable text extracted and 1 downloaded. Review extracted facts against official documents.
Submission instructions were not clearly detected. Review the official solicitation before deciding.
Construction bonding or site work may be required.
Use this as a processing and verification guide. GovWerk may summarize extracted text, but official attachments and SAM.gov remain the source of truth before bidding.
GovWerk processed readable document text where available. Treat extracted facts as a guide and confirm details in the official files.
GovWerk has not checked attachment metadata yet. The official source may still include files or external document links.
Posted date
2026-08-11
Response deadline
2026-08-28
Due date
2026-08-28
Archive / status
2260-08-29
Always confirm the exact deadline, timezone, and submission method in the solicitation documents.
Codes help with fit, eligibility, and search patterns. Confirm any code-dependent decision against the official solicitation.
What industry is this?
Not listed
NAICS plain-English explanation
Not loaded yet
SBA size standard
Not loaded yet
What is the government buying?
Not listed
PSC plain-English explanation
Not loaded yet
Who can compete?
No Set aside used
When is it due?
2026-08-28
Posted date
2026-08-11
Contact info
772 ESS/PKA | 772ESS.PKA.MACH1@us.af.mil
Do not submit from this summary alone. Confirm the exact portal, email, forms, deadline, and timezone in the official documents.
Quote submission instructions were not clearly extracted. Review the original solicitation and attachments before responding.
These are calm decision prompts, not a final recommendation. Verify any risk before acting.
Profile match
Score this opportunity from a profile to see match reasoning.
Broker fit
Poor Broker Fit (0/100)
Information quality
52%
Submission instructions not clearly extracted
The system did not clearly extract where or how to submit a quote. Confirm instructions in SAM.gov or attachments.
Use this section to confirm what is official, what GovWerk has processed, and what may still improve after source data is refreshed.
Description
AvailableDescription available when shown above
Documents
Pending1 document(s) had readable text extracted
Extracted requirements
PendingInterpretation or extraction may still improve
Similar awards
PendingSimilar awards not available yet
These Beginner V4 course links are based on simple signals found in the opportunity, attachments, and contract metadata.
Detected signal: PWS / SOW / SOO / Section L / Section M / attachments
The important instructions, evaluation rules, and performance requirements are often buried in solicitation sections and attachments.
Detected signal: Industry-specific requirement language
Industry-specific contracts have different proof needs, pricing drivers, red flags, and performance risks.
Open this section to load details.